Saral-3 Hydropower Plant Phase 1
A phase-based hydropower reference in Van Province that strengthens the company's profile in small and mid-scale renewable energy infrastructure.
Location
Van, Turkey
Category
Hydropower
Status
Completed / Operational
Project Period
Commissioned in 2020
Saral-3 Hydropower Plant Phase 1 adds another operational hydropower reference in Van Province and contributes to the company's portfolio of phased and regionally distributed energy infrastructure projects. Schemes of this type are valuable because they demonstrate delivery within staged development conditions rather than only single-package flagship works.
The project profile indicates a focused generation asset where civil execution, hydraulic coordination, and reliable operational planning must align within a more compact installation. Even at smaller scale, hydropower assets depend on precise construction logic and continuity between civil works and the generation objective.
For Arma Infrastructure, Saral-3 Phase 1 supports a broader market position in renewable water-energy infrastructure and shows the ability to participate in project environments where phased delivery and targeted output are part of the commercial and technical model.
Project Profile
Reference Value
Technical Highlights
Province
Van
Phase
1
Commissioning
2020
Installed Capacity
5.400 MW
Annual Generation
26.700 GWh