Morgedik Hydropower Plant Phase 1
A first-phase hydropower reference in Van Province that adds compact generation infrastructure to the overall project portfolio.
Location
Van, Turkey
Category
Hydropower
Status
Completed / Operational
Project Period
Commissioned in 2021
Morgedik Hydropower Plant Phase 1 represents a smaller hydro reference within Van Province and contributes to the operational spread of the Arma Infrastructure water-energy portfolio. Projects of this scale are important because they demonstrate that disciplined infrastructure delivery is not limited to large dams and major reservoir schemes.
Phase-based hydro assets require their own execution logic, including targeted civil works, hydraulic coordination, and practical operational planning aligned to a defined output objective. Their compact scale does not reduce the need for quality control, sequencing, and reliable interface management.
For Arma Infrastructure, Morgedik Phase 1 serves as another supporting reference in renewable generation infrastructure and reinforces the company's profile across varied hydropower project sizes and delivery models.
Project Profile
Reference Value
Technical Highlights
Province
Van
Phase
1
Commissioning
2021
Installed Capacity
2.030 MW
Annual Generation
9.090 GWh