Morgedik Hydropower Plant Phase 1

Projects

Morgedik Hydropower Plant Phase 1

A first-phase hydropower reference in Van Province that adds compact generation infrastructure to the overall project portfolio.

Location

Van, Turkey

Category

Hydropower

Status

Completed / Operational

Project Period

Commissioned in 2021

Morgedik Hydropower Plant Phase 1 represents a smaller hydro reference within Van Province and contributes to the operational spread of the Arma Infrastructure water-energy portfolio. Projects of this scale are important because they demonstrate that disciplined infrastructure delivery is not limited to large dams and major reservoir schemes.

Phase-based hydro assets require their own execution logic, including targeted civil works, hydraulic coordination, and practical operational planning aligned to a defined output objective. Their compact scale does not reduce the need for quality control, sequencing, and reliable interface management.

For Arma Infrastructure, Morgedik Phase 1 serves as another supporting reference in renewable generation infrastructure and reinforces the company's profile across varied hydropower project sizes and delivery models.

Project Profile

First-phase hydropower reference in Van Province commissioned in 2021.
A compact generation asset adding breadth to the company's hydro project portfolio.
Reflects smaller-scale energy infrastructure where execution discipline remains essential.

Reference Value

Demonstrates portfolio coverage across multiple hydro project scales and development phases.
Supports positioning in renewable infrastructure beyond major flagship assets.
Adds another operational water-energy reference in eastern Turkey.

Technical Highlights

Province

Van

Phase

1

Commissioning

2021

Installed Capacity

2.030 MW

Annual Generation

9.090 GWh