Bagisli Regulator and Hydropower Plant

Projects

Bagisli Regulator and Hydropower Plant

A long-operating regulator and hydropower reference in Hakkari that strengthens the portfolio with an earlier-generation water-energy asset.

Location

Hakkari, Turkey

Category

Regulator and Hydropower

Status

Completed / Operational

Project Period

Commissioned in 2009

The Bagisli Regulator and Hydropower Plant adds historical depth to the Arma Infrastructure project profile by representing an operational hydro reference with commissioning dating back to 2009. References of this kind are important because they show participation in water-energy infrastructure over a longer delivery and operating horizon.

As a regulator and hydropower asset in Hakkari Province, the project reflects the practical civil and hydraulic coordination required in mountain-region water infrastructure. It sits within the category of projects where water-control logic and power generation must function together under geographically demanding conditions.

For Arma Infrastructure, Bagisli is relevant not only for its installed capacity and energy profile, but also because it extends the company's reference timeline and demonstrates continuity across different periods of hydro infrastructure development.

Project Profile

Regulator and hydropower reference in Hakkari Province commissioned in 2009.
Represents a longer-operating hydro asset within the wider portfolio.
Linked to mountain-region hydraulic and civil execution conditions.

Reference Value

Adds historical depth and operating continuity to the project reference base.
Supports the company's positioning in regulator-led water-energy infrastructure.
Broadens the geographic and temporal range of hydropower references.

Technical Highlights

Province

Hakkari

Commissioning

2009

Installed Capacity

29.572 MW

Annual Generation

95.000 GWh