Aslandagi and Beyyurdu Energy Group
A phased energy group reference in Hakkari that reflects multi-asset hydropower development within a single regional program.
Location
Hakkari, Turkey
Category
Hydropower Energy Group
Status
Completed / Operational
Project Period
Commissioned on 18 June 2021 and 1 March 2023
The Aslandagi and Beyyurdu Energy Group broadens the Arma Infrastructure portfolio through a multi-asset hydropower reference in Hakkari Province. Rather than a single isolated structure, this type of energy group reflects a coordinated development model in which multiple generation components contribute to one regional infrastructure program.
Its phased commissioning profile, with one stage entering operation in 2021 and another in 2023, underlines the importance of sequencing, staged readiness, and continuity of technical management across multiple delivery milestones. That characteristic makes the project relevant from both construction and program-control perspectives.
For Arma Infrastructure, the reference is valuable because it extends the project portfolio into grouped and phased hydro assets where coordination between packages, schedules, and long-term operational intent is central to successful delivery.
Project Profile
Reference Value
Technical Highlights
Province
Hakkari
Commissioning
18 Jun 2021 / 1 Mar 2023
Installed Capacity
19.160 MW
Annual Generation
64.720 GWh